E-6, Slide or Transparency Processing...

E6 Processing requires stringent quality control. To that end our monitoring is checked prior to any films being processed and at intervals of every 10 rolls of film. This ensures the highest possible quality and consistency that is required for your slides.
A Push / Pull service is available to one stop.

Our standard service time is a 24 hour turn around but an express 2 hour service time is available on request.
Films can be mounted or processed only. Processed only films can be rolled in continuous sleeving or cut into strips of 4 or 6 frames.
We can Process 135, 120 And 220 E-6 Films.
|
|
|